How to install the smart wing gate? The wing gate installation is divided into three parts: pre-embedded, fixed wing, controller wiring. The following is a detailed description of the installation steps for your reference!

Wing Gate Installation Step 1: Line Embedment ● Set the chassis position according to the customer's requirements. Choose the best route between the center point of the fixed position of the chassis and the control room, pre-embed or excavate the cable trench.

● Put appropriate diameter conduits (PVC pipe or steel pipe) in the dug line trench to penetrate the power line and control line required by the equipment (control lines include: manual button line 3 core, RS485 communication signal line 3 core). If the distance is far away, the power line and control line must be separately piped (2 pipe distance should be above 50CM).

● Connect an 8-core machine line between two gates.

● After all lines are laid, it is best to fill the concrete after successful commissioning.

Wing Gate Installation Step 2: Fixed Wing Gate

● First, power up the two wing gates and turn the wings to the closed state. Then align the wings of the two wing gates so that the wings are in the same straight line. The distance between the wings is 3CM to 5CM.

● It is necessary to test whether the infrared is aligned, and all the functions are debugged. ● Mark the ground at the center of the screw hole of the base and the edge of the chassis, remove the chassis, and drill the hole vertically with a drill on the screw hole that marks the mark. , size, depth to meet the requirements of the expansion screw equipment will be moved to the original position, into the expansion screw and tighten the screws can be sharp corner wing gate fixed size map:


Right Angle Wing Gate Installation Dimensions:

Turn on the power:

Before power on, you should carefully check the various terminals of the main board of the brake, whether there is looseness, ensure that the mechanical part is not stuck, the operation is flexible, the equipment has been reliably grounded, there is a short circuit phenomenon, etc., and after confirming the correctness, it can be powered on.

Function debugging ● This gate is a two-way normally closed wing gate. External feed card signal, outgoing card signal.

● When there is no swiping signal, when the pedestrian enters from the entrance to the alarm. Similarly does not swipe the card signal, when the pedestrian from the entrance to the alarm ● Pedestrian brush cartoon line: Wing open start delay, in the set pass time pedestrian pass the wing Closed, if the pedestrian does not pass the time, the wing will be closed. When someone enters in the reverse direction, the gate will be closed immediately and an alarm will be given. When the person or object is in the intermediate anti-clip infrared, the alarm will be issued but the gate will be turned off. Will not close so as to avoid unnecessary harm.

● If a person is too close to the passage of a pedestrian, the time limit is used as a person.

● Automatic detection: When the object is obstructed, it will be automatically detected 5 times, and then the blocking position will be stopped. If the signal is given in the same direction, the gate will return to normal. If the zero point of the switch could not be found at the beginning, five tests will be conducted.

After 5 tests, the operation will be stopped so as to avoid damaging the brake parts;

● Wing gate switch operating speed is adjustable. See parameter settings for details.

Wing Gate Installation Step 3: Controller Wiring ● Connect the power cord of the equipment according to the wing gate wiring diagram ● If the equipment needs to install other control systems (such as access control system, fingerprint management system, consumption management system, etc.) The output signal line is connected to the terminal block 1 (green), 2 (black), 3 (blue), 2 (black) is the common end ● If you need to use the manual button to control the gate, then the factory will be equipped with a small button line that is extended can.

● The two wing gates are used synchronously. Please connect the line to the two gates and connect them.

● Infrared access method. The power supply is connected to 12V. Signals from the right to the left are IR1, IR2, IR3, IR4, and IR5. At least 3 pairs or 3 pairs or more, if 3 pairs will access IR1, IR3, IR5.

● If two gates are connected, they need to be connected. The connection line is an 8-core line. The access mode is as follows. If there are two AB gates, the 11-connection of the A-line will be B. At the end, the A station 12 is connected to the B station 11 station, the A station 13 is connected to the B station 17 station, the A station 14 is connected to the B station 16 station, the A station 15 is connected to the B station 15 stations, and the A station 16 is connected to the B station 14 station A station 17 terminates B station 13 station A station 18 terminates station B station 18 station, as does many stations. Both gates of a channel are connected in this way.