Because cast iron fences are beautiful, generous and resistant to corrosion, and colors can be arbitrarily matched with simple shapes and easy installation, lightweight and flexible features, more and more municipal enterprises, tourist attractions and high-end villas will use cast iron fences as Building materials, in order to achieve the final results to our expectations, then the pre-engineering arrangements that is the most important ah, the following small series for everyone on the construction of cast iron fences before the preparation and construction programs.

First, the overall guiding ideology

First, we should select a qualified decoration company because they will select outstanding construction management and technical personnel, organize lean project departments, select construction teams with similar engineering construction experience, go all out to organize construction, and sincerely cooperate with the owners. Keeping promises, we will ensure that the project will be completed with high quality, efficiency and safety with first-class quality, first-class speed, first-class technology and first-class management and service.

Second, the principle of construction and deployment

Third, conscientiously implement the engineering construction program

Fourth, follow the construction process and construction specifications, reasonable arrangements for construction procedures, follow the principle of construction on the ground.

Fifth, the use of scientific network technology, reasonable organization of human and material resources.

Sixth, adopt advanced construction technology and scientific management methods to complete construction tasks with high quality and efficiency.

7. Take effective measures to improve the level of construction mechanization, reasonably reserve materials, and ensure the project needs.

VIII. Construction Deployment

(1) Experience in construction-related projects will be deployed under the premise of meeting your company's requirements. First of all, in the project, we must follow the principle of the short-term construction process after the first underground, first deep, shallow, and first long-term processes to organize the construction. Second, combine engineering characteristics, engineering layout and other factors.

The main task of the construction preparation phase is to investigate, understand, familiarize with the project content, contracts, and design data, complete the design submission and drawing review work, and prepare the construction plan and job design. Construct temporary production facilities, implement construction equipment and labor resources, and ensure the transfer of control points and the control network.

(2) Construction procedures

The entire project implements flat division, simultaneous construction, construction methods for masonry and formwork, tied steel reinforcement, pouring concrete and wire mesh maintenance, and brickwork wall masonry construction, so as to complete the engineering task within the required construction period.

During the construction, it is required to do a good job of material planning, and the construction materials should be stored for 3 days. Pro set up the mixing site, rebar processing plant, circulating material yard, warehouse, etc. The site needs temporary electricity 8KVA.

Nine, cast iron wall construction technical requirements

1. The materials, specifications, quantities and combustion performance grades of the materials used in the production and installation of the balustrade shall meet the specifications and design requirements.

2.Before the construction of the railings, a model shall be used to complete the construction process of cast iron railings for all types of construction samples. After the supervision and inspection of Party A, only large-scale production and safety can be performed.

3. Each batch of materials entering the site must be approved by Party A to be installed before installation. At the same time, it is necessary to provide raw material qualification certificates, re-inspection reports and related inspection reports.

4, guardrail height, spacing, thickness, installation position must meet the specifications and design requirements.

5. The railing buried plate must be fixed to the structural layer. The completed surface after the expansion bolt is fixed should be lower than the plastering layer or leveling layer to ensure that the surface layer construction is not affected.

The construction scheme for cast iron fences was introduced here, and it is hoped to be helpful to everyone. If you want to know more related information, you can pay attention to this website information.

Wall Construction Exterior Real Stone Paint Construction Living Room Glass Partition Wall Balcony Wall Decoration Loft Bedroom Partition Wall Modeling

It is formulated with antioxidant, antirust additive, Antifoam Additive and others. It is used for blending turbine oil. It satisfies the requirements for oxidation stability and anti-rusting of L-TSA steam turbine oils. It has no crystallization even in winter. This product is suitable for blending different viscosity grade L-TSA steam turbine oils. It can also be used for blending anti-oxidation, anti-rusting hydraulic oils.

Turbine Oil Additive Package

Turbine Oil Additive Package

Turbine Oil Additive Package

Zhengzhou Chorus Lubricant Additive Co.,Ltd. , https://www.cn-lubricantadditive.com

Posted on