[China Aluminum Industry Network] The installation technology of aluminum veneer ceilings, aluminum veneer ceilings are everywhere, and are widely used in interior decoration, in the decorative effect is very good, in addition to aluminum veneer ceiling products are very important In addition, the installation process of aluminum veneer ceilings is also very important, the correct installation is better in the decorative effect, more detailed in the details.

1. Weakness line: According to the horizontal line of the elevation of the floor, follow the design elevation, follow the horizontal line of the ceiling elevation of the perimeter of the wall, and find the center point of the room. Along the horizontal line of the elevation of the ceiling, draw the keel on the wall centered on the center of the room. Location line.

2. Install the main keel boom: After bombing the ceiling elevation line and the keel position line, determine the elevation of the lower end of the boom, install the pre-processed boom, and install the boom with the 8 diameter expansion bolts fixed on the ceiling. Hangers use a diameter of 8 round steel, and the spacing between the hangers is controlled within the range of 1200?.

3, the installation of the main meridian: the main keel is generally selected light steel keel C38, spacing control in the 1200? range. When installing, it is connected with the main keel's hanging piece and the suspender.

4. Install side keel: According to the ceiling height requirement, cement nails shall be used to fix the 25*25? keel around the wall. The distance between cement nails shall not be greater than 300?.

5. Install secondary keel: According to the specification size of aluminum ceiling, install the sub keel matched with the plate, and the secondary keel is hung on the main keel through hanging pieces. When the length of the secondary keel needs multiple continuous extensions, the secondary keel connection is used to connect the secondary keel and the opposite ends are connected and fixed after straightening.

6, the installation of metal plates: Aluminum ceiling installed in the middle of the assembly area in the direction of the vertical keel pull a reference line, align the reference line to both sides of the installation. When installing, take it lightly and gently, and then press the sides of the square board gently in the order of the flanging parts, and then push the keel and push tightly.

7. Cleaning: After the aluminum ceiling has been installed, all the surface of the board needs to be wiped clean with cloth, and dirt and fingerprints are not allowed.

Topmount Sink

The installation of the countertop basin is easy, as long as the hole is opened on the countertop. There are a variety of sink edge designs for over-counter basin sink styles to choose from. It is necessary to ensure that the connection gap between the sink and the countertop is uniform, and there is no water seepage.

Topmount Sink,Top Mount Farmhouse Sink,Top Mount Stainless Steel Sink,Top Mounted Wash Basin

JIANGMEN MEIAO KITCHEN AND BATH CO.,LTD , https://www.jmmeiaogroup.com

Posted on