In modern home improvement, bathroom renovation is also a very important part of the home, in particular, tile sticking method must be in order to Caixing, then in the bathroom tile stickers in the end is the first posted wall tiles or floor tiles it? The following Xiaobian came To tell you about the bathroom tile order is how and the three tiles to explain the order.

1, bathroom tile order first of all according to your bathroom renovation, the first floor tile or first shop wall tiles, this is also based on the actual situation of the family will be better, we know that the construction or to proceed according to other renovation progress Considering how to paste will be better, but also to help the later decoration Caixing, so it is still necessary to determine the specific circumstances of the family bathroom renovation, in fact, paving tiles or wall tiles is conducive to the construction of the project before Reasonable protection, this is a very critical step, in the paving is to consider whether it will be a good installation of bathroom products, these are to be arranged in it, as long as they consider place, so that it will be compared to the decoration convenient.

2. Generally speaking, people are busy now, so they just like to decorate them to complete the decoration company. They feel that this saves more time. Most of the decoration companies are paving bricks before paving them. In the way of paving the floor tiles, because this way of paving the wall tiles before paving the floor tiles, this will not affect the wall tiles. The most important thing is that it will not cause any impact on the post-decoration, so this paving The method is also preferred by people. Most people will choose to lay the wall tiles first and then plaster the tiles.

3, bathroom tile order, if the first paving paste the floor tile in the paving the wall, then this time we must pay attention to a few points, for example, we must wait for the brick dry, fixed after the wall tile, If you're doing the next step if the floor tile isn't completely dry, then people can walk up and down and you can imagine the consequences. This is very easy to cause the floor tile to be empty, loose, and high and low. Equality issues, so if you choose to lay tiles after laying tiles first, here's a reminder to make sure that bricks are tiled 24 hours after the tiles have been tiled so that they will not be affected.

Summary: What is the order of the bathroom tiles and the three tiles in order to explain the relevant content is introduced to this, although the paving tiles seem to be a simple task, but if you do not follow the order, then it will cause the tiles Empty phenomenon, so it is better to follow the order when posted.

We are manufacturer with fully completed Sliding Door Systems including Home Barn Door Hardware ,Mini Barn Door Hardware,Heavy Duty Barn Door Hardware,Pocket Door Hardware and other barn door hardware products with more than 14 years of manufacturing . Our products are perfectly fit to residential home doors,commercial doors,farm doors and other outdoor using .

You may select the styles from our existing designs.Classically,simply and conveniently,we will make you own a cosy place.

We welcome DIY designs as well.Let us help you for a distinctive and own-style home.

Sliding Door Systems


Sliding Door Systems

Sliding Door Systems,Sliding Door Hardware,Heavy Duty Sliding Door Hardware,Industrial Sliding Door Hardware,Sliding Barn Door Kit

Foshan Nanhai Xin Jianwei Hardware Co., Ltd , https://www.aaghardware.com

Posted on