If you are renovating the house for the first time, what to do first and then what, and what precautions are in the construction process, you may not be able to say it, it does not matter, today ’s article can help you clarify the entire decoration process, Move the small bench, let's study together.

For people who have done a decoration once, decoration is not a particularly difficult thing, just that there are a lot of procedures. Most of the time, it is not a problem of the process, but a communication problem between people. The communication is good. , Most problems can be solved smoothly.

But there are also many people who build a house and engage in a whole family of chickens and dogs, some people are depressed, and some people want to divorce. What is the reason? It is nothing more than to see someone's true colors through decoration. It can be seen how important the decoration is for family harmony.

So, figuring out the decoration process is also very important for family harmony, students!

In fact, decorating the house is very simple, it only takes six steps:

The first step: preliminary design

In the early stage of decoration, there are many aspects that need to be considered, which is also an important part of controlling the budget and formulating the effect of later decoration.

If you take a step-by-step decoration, not only can you not achieve the desired effect, but also the cost of decoration will be several times higher than expected. Therefore, it is necessary to do a preliminary design.

Step 2: Main body dismantling

Before dismantling, do not rush to start construction, you need to have a comprehensive understanding of the interior of the house, which is the load-bearing wall, you need to mark it, and the wrong consequences are unimaginable.

And it is better to be able to do the sub-frame construction, and the reference model can be rectified to avoid regret after the disassembly and modification, it is too late.

In fact, demolition of the wall is also a major project, there are many points that everyone should pay attention to:

1. Seal the water pipe before removing it, so as not to be blocked afterwards

Before dismantling, whether it is dismantling the ceiling, or dismantling the walls or the ground, protection work must be carried out first.

First protect the indoor drainage system openings, such as kitchen and bathroom, balcony drainage holes, and toilet toilet manure pipes, and check whether they are sealed, and make indoor power off measures in advance, and pull temporary power on site. Provide for dismantling, to prevent accidents such as wire fire and electric shock.

2. Remove the ceiling and take the opportunity to check for water leaks

Generally, if you are renovating an old house, when removing the ceiling, pay attention to the pipeline hidden in the ceiling, and take the opportunity to check for signs of water leakage.

3. Never dismantle the wall between the structural beams and pipes

There is an iron rule that must not be touched when removing walls: that is, load-bearing walls cannot be removed. In addition, in general, if the partition wall is not changed, in order to embed the hydropower, the wall will also be hit.

It should be noted that buried pipelines must not knock out places such as beams, columns, pipelines, load-bearing walls, shear walls, etc. to avoid damaging the building structure and affecting residential safety.

The third step: detail transformation

When the entire frame inside the new house is formed, a series of constructions will begin. First of all, the water and electricity will be done. After the water and electricity are tested, the process of tiling and painting the walls will begin.

After these treatments are completed, it will be easier to install electrical appliances such as range hoods. Generally speaking, after the kitchen floor tiles are finished, it is almost necessary to paint the walls and furniture.

Regarding the hydropower transformation, there are also many points to note:

1. When we hand over the room for decoration, we must pay attention to the signing of the contract, we must first lead the electrician master to plan and designate! Then make the budget! Generally, after the completion, the cost cannot exceed 10%. The budget part does not need to be given!

2. During the weak current reconstruction, it is necessary to pay attention to the use of shielded cables. Most strong and weak currents are run from the ground, and it is very common for strong and weak currents to cross and parallel in short distances. If the shielded cable is not used, it will cause certain interference to the signal.

3. PVC pipes are generally used during hydropower transformation! JDG pipes are not allowed!

4. Water pressure test This is the most important point that cannot be ignored. During the test, the pressure is not less than 0.6 MPa, subject to the static pressure 15 minutes gauge pressure does not fall. In addition, depending on the smoothness of the water flow, an irrigation test should be conducted to prevent insufficient water pressure and poor drainage.

5. When installing the socket switch, there is no science to say how many must be installed, all of which can be used according to their own needs! Later, combined with the advice of the masters, a comprehensive and reasonable layout!

Step 4: Kitchen, door, floor

After the kitchen floor tiles are laid, the kitchen and bathroom ceilings will be suspended, and the water pipes will be wrapped to make it more beautiful.

Then install the cabinet, and then install the wooden door. After the wooden doors were installed, they almost started to stick to the wooden floor.

The installation of kitchen cabinets is also a big project, there are three points to note:

1. Cabinet installation should pay attention to the installation sequence. Generally speaking, the installation sequence of cabinets is floor cabinet, hanging cabinet, faucet and sink, stove and electrical appliances. Once the order is out of order, the installation cannot proceed smoothly.

2. The cabinet installation must clean the ground. If the ground is not cleaned, the level of the ground cannot be accurately found. If the cabinet is not balanced with the ground, the cabinet door will not be balanced.

3. The installation of cabinets should pay attention to the sealing problem. The sealing here includes not only the cabinets, but also the installation countertops, and the unsealed seal after opening the holes.

Step 5: Install lamps and sanitary ware

After the wallpaper is finished, you can install lamps and sanitary ware.

At this step, it will be relatively simple, and you can arrange the installation with your own consciousness.

After the sanitary ware and lamps were installed, the new home was basically renovated.

Step 6: Furniture and electrical appliances enter the venue

The final step is to arrange for furniture and electrical appliances to enter the venue.

However, we should remind everyone that the furniture and appliances you choose should be able to match your own style. Only in this way can you enhance the indoor effect.

When choosing furniture, it depends on whether the materials and quality meet the standards, and the safety of the family is more important.

Summary: After seeing these 6 without going through the decoration process, everyone has a deeper understanding of the decoration, then follow these procedures to step by step decoration, a beautiful new home will soon be completed.

What, the decoration still uses his own money? ! The Qi family is decorated in installments, with an ultra-low annual interest rate of 3.55% and a maximum loan of 1 million. Apply now to enjoy the discount

Decoration process

  1. Applications:Jaw crusher,Mining machine,Stone crusher.
  2. Material of accessories: High manganese steel, high quality high manganese, new composite material, modified high manganese steel, new high manganese steel, super high manganese steel,modified high manganese steel, new high manganese steel
  3. Applicable materials: Widely used for medium-sized crushing of various ores and bulk materials in mining, smelting, building materials, highway, railway, water conservancy and chemical industries

Nordberg Jaw Crusher Parts

Nordberg Crusher Parts,Nordberg Spare Parts,Nordberg Jaw Crusher Parts,Crusher Machine Spare Parts

Ma An Shan Shi Bo Da Jing Shen Machinery Co.,ltd , https://www.bodamachinery.com

Posted on